 
EVERPADS™
Mill
World Famous “Bay” Runway At JFK International
When World famous
John F. Kennedy International Airport needed their main “Bay” runway
completely replaced within an absolute deadline of 120-days, it meant
precision milling 18-inches deep of the 3rd longest runway in The
United States; 14,572 feet of specially hardened concrete designed for
high-volume takeoffs, landings, and returning NASA Space Shuttle
missions. The prime
milling contractor awarded the project chose EVERPADS™ " Legends "
to meet their critical demand for traction and steering control
on all six of their ROADTEC RX900 milling machines.
EVERPADS™ " Legends "
Premium Rubber Track-Pads provided the needed traction and
vibration absorption that kept the carbide teeth biting consistently,
maximizing their wear-life and improving material removal rates
resulting in this project being completed ahead of schedule and
under-budget.
We are often asked
"What makes EVERPADS™ better
and who uses them?".
Well, here’s another example of why professional milling
contractors choose EVERPADS™ - When only the BEST will do.
 
EVERPADS™
Chosen by Seismic Engineers
When site engineers at a major development
project gave the green light to proceed with excavating operations,
they had to first eliminate any risk of seismic damage to adjacent
historical buildings by heavy crawler excavators working in close
proximity. They chose EVERPADS™ Premium Rubber Track Pads as the
solution to absorb heavy equipment vibration before it could reach the
foundation and radiate out to sensitive areas.
|